07889 334849Get a quote☰
✕
BA3 · One RCBO per circuit · Certified

Consumer unit replacement in Midsomer Norton

A new consumer unit for your Midsomer Norton home with a main switch and a Type A RCBO on every circuit, so a fault in the garage no longer switches off the kitchen.

Every board priced individually, with a fixed written quote.

Row of RCBOs in a newly installed consumer unit

The problem with split-load boards

Many homes had their fuse board changed in the 1990s or 2000s for a split-load board: one or two RCDs, each protecting a group of circuits. It was a big improvement at the time. The drawback is that one RCD covers several circuits, so when a fault trips it, everything on that side goes off together. People often find out on a cold morning when the boiler, the fridge and the sockets have all been off overnight.

We replace those boards with a metal consumer unit that has a double-pole main switch and a Type A RCBO on every circuit. A fault on one circuit only switches off that circuit. That is the only type of board we fit. We do not install split-load or dual-RCD boards.

The other reason to change a board is space. Estate houses that have had a conservatory, an electric shower and a garden room added often have no spare ways left, and extra boxes have been mounted alongside. A new board takes everything back into one enclosure and leaves room for an EV charger later.

Boards on the estates and in the older streets

On the 1970s estates either side of the Fosse Way, the board is usually in the hallway, the understairs cupboard or the garage, often still the original. Original boards from that time have rewireable fuses and no RCD protection, so sockets that could supply equipment outdoors are unprotected. That is a C2 on an EICR.

In the older terraces near the centre and around Welton the board is sometimes in a cellar or a low cupboard. If that spot is damp, or awkward to reach in the dark, we discuss moving it as part of the job. The meter position stays where your supplier put it.

Newer houses on recent developments usually already have an RCD board in good order. For those, a full change is rarely needed and we will say so; adding a circuit is usually the better answer.

What you get with a new board

The price includes testing every circuit before and after, so you know the wiring behind the board is sound.

How we price consumer units in Midsomer Norton

We quote each job on its own merits. The written quote follows a look at your board and a quick test of the circuits, either at a survey or from a phone and photo consultation, and the price is fixed before any work starts. Quotes are free.

Get a quote

A one-day job for most homes

Plan for the power to be off for most of a working day. Freezers stay cold if they are kept shut.

  1. We test the existing circuits and note any that need attention.
  2. The old board comes off and the new one goes in, with each circuit on its own RCBO.
  3. Tails and bonding are upgraded where the quote includes them.
  4. Every circuit is tested again before the power goes back on.
  5. The certificate is emailed to you, and the Building Regulations certificate comes by post.
Consumer unit with RCBOs, main switch and a yellow surge protection module
A finished RCBO board with surge protection fitted on the incoming supply.

Board changes in the villages

We fit RCBO boards across the villages around Midsomer Norton, including Paulton, where around 420 homes were built on the former printing works site between 2009 and 2015, and Chilcompton, Holcombe, Coleford, Farrington Gurney and High Littleton.

See also consumer unit replacement in Radstock.

Price a new consumer unit

A photo of the board with the cover open, if it is safe to do so, is the quickest way to get a price. Or just leave your number.

Prefer to talk? Call DS Electrical on 07889 334849.

Consumer unit questions from Midsomer Norton

My board keeps tripping and everything goes off. Will a new board fix it?
The new board will stop one fault from switching off other circuits, but it will not fix the fault itself. We find the faulty circuit or appliance first, then fit the board.
Is a split-load board unsafe?
Not necessarily. It may pass an EICR. The drawback is that one fault switches off several circuits at once. An RCBO board protects each circuit on its own.
Do new boards have to be metal?
Consumer units in homes are now made with non-combustible enclosures, normally steel. Every board we fit is metal.
Will I need an electrician to come back for an EV charger later?
If you think you will want a charger, tell us. We can leave a spare way and size the board for it.
How much notice do you need?
Usually a week or two. If the board is damaged or there is a fault, we prioritise making it safe.

Other services in Midsomer Norton

Swap the split-load board?

Send us a photo and the number of bedrooms and we will price an RCBO board.

07889 334849
Send an enquiry WhatsApp Email us
5.0
Google rating · 24 reviews
18
Years experience
NAPIT
Approved contractor 66245
£2M
Public liability cover
Call Dan07889 334849 WhatsApp Email
Call Dan: 07889 334849