07889 334849Get a quote☰
✕
BA11 · Period homes · Minimal disruption

House rewires in Frome

Full and partial rewires in Frome, planned so cables follow voids, floors and lofts rather than cutting through original plaster, joinery and stone wherever we can avoid it.

Priced per property, fixed in writing after a survey.

Period-style wall lantern lit in a cottage room

A rewire that respects the building

Most rewiring work in Frome is in older houses, and the main job is planning the routes. A cable has to get from the board to every socket, switch and light. In a modern house that means chasing walls. In a house with lime plaster, original cornices, panelled walls or exposed stone, chasing everything is the wrong approach.

We start in the loft and under the floors. Upstairs circuits can usually be run in the roof space and dropped down inside partitions. Ground-floor circuits can often be run under suspended floors, or from a cellar. Where a cable has to rise up a solid wall, we look for a cupboard, the side of a chimney breast, or behind a skirting, before we pick up a chasing tool.

Where a wall is too precious to cut, surface options exist: neat painted conduit, or accessories mounted on the skirting. We discuss them with you rather than decide for you.

The building types we rewire in Frome

Frome grew on the wool and cloth trade, and its centre has houses from the 16th century onwards, many of them listed. The Trinity area has small houses from the late 17th and early 18th centuries, restored in the early 1980s. Victorian and Edwardian terraces fill the streets running out from the centre. Each type has its own construction, and its own good and bad routes for cable.

In the restored Trinity houses the 1980s wiring is now around forty years old and often lacks earths on lighting circuits or RCD protection, which can point towards a rewire. In Victorian terraces the floors are usually suspended timber, which makes ground-floor routes easier.

If your house is listed, alterations that affect its character may need listed building consent from Somerset Council. Rewiring that uses existing routes and voids often has little impact, but you should check with the conservation officer before work starts. Our heritage rewires page covers this in more detail.

What the rewire includes

Every quote is fixed and itemised after a survey.

How we price rewires in Frome

No two houses are the same, so we don't publish a price list. The price depends on the size, construction and access of the property, and period houses often need more time for cable routes. The survey decides the price, and the written quote that follows is fixed.

Get a quote

How we run a period rewire

We protect floors, stairs and joinery before any work begins.

  1. Survey, route plan and fixed quote.
  2. Lift boards and work from the loft and floor voids, room by room.
  3. Any unavoidable chases are cut, cabled and filled ready for your plasterer.
  4. Second fix with your choice of accessories.
  5. Testing, certification and notification.
Hallway in an older house with new LED downlights and painted walls
A finished hallway after rewiring.

Rewires in the villages around Frome

Village houses around Frome include some of the oldest buildings in the area. We rewire in Norton St Philip, home of the George Inn, Beckington, Rode, Hinton Charterhouse, Mells, Great Elm, Nunney and Buckland Dinham.

Elsewhere: rewires in Radstock and rewires in Midsomer Norton.

Talk to us about a rewire

Tell us roughly how old the house is, whether it is listed, and how many bedrooms. We will call back to arrange a survey.

Prefer to talk? Call DS Electrical on 07889 334849.

Rewire questions from Frome

Can you rewire without damaging original plaster?
In most rooms we can avoid it by using lofts, floor voids, cupboards and chimney breasts. Where a cable has to go up a solid wall with no other route, we discuss the options with you first, including surface conduit.
Do I need listed building consent to rewire?
It depends on the work and the building. Works that affect the character of a listed building can need consent. Check with Somerset Council’s conservation officer before starting; we can describe the routes and methods we plan to use so you can explain them.
What accessories can I choose?
Standard white, screwless metal finishes from the Click Scolmore range, or period-style switches and sockets. They are priced in the quote.
How long will it take?
A two-bed house is typically four to six working days for us, a three-bed five to ten, plus plastering time. Period houses can take longer because routes take more care.
Do you fit smoke alarms as part of a rewire?
Yes. Mains-interlinked smoke alarms, a heat alarm in the kitchen and CO alarms where needed are included.

Other services in Frome

Rewiring an older Frome house?

A survey costs nothing. We will walk the house with you and plan the routes before quoting.

07889 334849
Send an enquiry WhatsApp Email us
5.0
Google rating · 24 reviews
18
Years experience
NAPIT
Approved contractor 66245
£2M
Public liability cover
Call Dan07889 334849 WhatsApp Email
Call Dan: 07889 334849