07889 334849Get a quote☰
✕
BA16 · NAPIT approved · Part P notified

Home EV charger installation in Street

A lot of homes in Street are inter-war and 1960s semis or newer houses on the edges of town, many with a drive or garage beside the house. That usually makes a charge point a tidy job. This page follows an installation from the first phone call to the paperwork you keep, and explains what happens when the supply itself needs attention first.

Home charge point fixed to a Somerset stone wall with the cable holstered

Why so many houses in Street suit a charger

Street is known for its Clarks shoe-making heritage, and its housing runs from Victorian and Edwardian terraces on the older streets, then inter-war and 1960s semis, then modern estates on the edges. The semis and estate houses are often good candidates, with off-street parking alongside the house and a consumer unit not far from the front wall.

The older terraces are more mixed. Some have rear access or a garage at the back; others only have parking on the road, and a home charger is not something we can fit there. Towards Walton and Ashcott, to the west, and down to the Somerton edge, plots are often bigger and runs longer.

Henley blocks and meter tails beside the sealed supply cut-out
Meter tails and Henley blocks beside the supply cut-out, part of the supply we check before adding a charger.

From first call to first charge

  1. The first call. Tell us where you park, where the meter and board are, and which charger you are leaning towards. Photos of the board, the meter and the parking spot help a lot.
  2. The survey. We look at the board, measure the earthing, check how much the supply already carries, plan the cable route and agree the charger position. We also check that your home Wi-Fi reaches that spot, because the app relies on it.
  3. The written price. One fixed figure for the whole installation, with the charger unit, any extra cable and any board work shown clearly and VAT at 20% on its own line.
  4. Notification. We notify the distribution network operator (DNO) about the new charger for you.
  5. Installation. The dedicated circuit goes in with its own Type A RCBO, the cable is run and fixed, and the charger is mounted and connected.
  6. Testing and handover. The circuit is tested, the app is set up on your phone and we watch the car start charging before we leave.

How we price EV chargers in Street

We price by the job, not the hour. The price depends on the charger you choose, the cable run and the board: if the board needs replacing, or there is a fault to find first, that goes on the quote too. We confirm everything in a fixed written quote after the survey, charger and all.

Get a quote

When the supply needs work before a charger

Not every house is ready on day one. At Butleigh, about three miles south-east of Street, the existing supply set-up had a fault that needed investigating before anything new could be added. Once that was found, we fitted a new IP65 EV charger distribution board, new meter tails and a new main earthing conductor, and certified the work on a Minor Works certificate.

For anyone wondering what those parts are: the meter tails are the heavy cables between the meter and your consumer unit, and the main earthing conductor is the cable that connects your installation to its means of earthing. Both carry the full weight of the house when a charger is running, so if either is undersized or damaged, it gets replaced. Some properties also need an earth electrode for the charge point; the survey tells us.

Consumer unit with an RCBO on every circuit and a surge protection device
An RCBO on every circuit and a surge protection device.

What you are handed at the end

File these with the house documents. If you sell, the buyer's solicitor may ask for the certificate and the Part P record.

Two jobs south of Street

Both show the groundwork that sometimes has to happen before a new heavy circuit is added.

What moves the price up or down

A semi with the board on the front wall and the car on a drive beside it is at the simpler end. A garage at the far end of a garden, a buried run in armoured cable, an old board that needs replacing or supply work like the Butleigh job all add to it. The charger itself is priced by model: we fit Andersen, Ohme, Zappi and Hypervolt, normally at 7.4kW on a single-phase supply. Where the house is already busy with electric heating or cooking, a CT clamp for load management may be part of the quote.

Related pages: consumer unit replacement in Street, EICR in Street, our electricians in Street for smaller jobs, and our Street area page.

Ask about EV Charger Installation in Street

Leave your details and a line about the job. We will ring you back to talk it through and arrange a survey or a written price.

Prefer to talk? Call DS Electrical Installations (SW) Ltd on 07889 334849.

Questions we get asked in Street

Our garage is beside the house. Can the charger go inside it?

Yes, if the car is parked in the garage to charge and the lead reaches comfortably. Many semis in Street have an attached or side garage, which keeps the charger out of the weather and makes for a short cable run. If the car usually sits on the drive in front of the garage, an outside wall position is often more practical. We agree the spot with you at survey.

Do I need to be in for the survey and the installation?

For the survey, yes, so we can look at the board, the meter and the parking spot with you and agree where the charger goes. On installation day someone needs to let us in and be around at the end for the app set-up and handover, as the app goes on your phone.

Will I get an Electrical Installation Certificate or a Minor Works certificate?

A new dedicated circuit for a charger is certified on an Electrical Installation Certificate. A Minor Electrical Installation Works Certificate covers alterations to an existing circuit, as with the supply work we did at Butleigh. Either way the work is tested, and notifiable work is registered under Part P through NAPIT.

I already bought a charger. Will you fit it?

Tell us the make and model at the first call. We fit Andersen, Ohme, Zappi and Hypervolt units and know how each one is installed and set up. If yours is a different make, we will tell you honestly whether we can take it on before booking a survey.

Do you cover Walton, Ashcott and the Somerton side?

Yes. We work across Street and out to Walton and Ashcott to the west, Butleigh to the south-east and the Street side of Somerton. Larger plots in those villages often mean longer cable runs, which we measure and price at the survey.

Other work we do in Street

EV Charger Installation in other towns

Get a price

EV Charger Installation in Street

Priced by the job, not by the hour. A written, fixed price after a survey, NAPIT certification on every notifiable job.

07889 334849
Send an enquiry WhatsApp
5.0
Google rating · 24 reviews
18
Years experience
£2M
Public liability cover
BA16
Postcode covered
Call Dan: 07889 334849
Call Dan07889 334849 WhatsApp Email